Raffles City
Complete kitchen, ductwork, ceiling and flooring removal, with M&E capping carried out to mall management specifications for a smooth handover.



Raffles City • F&B Unit
Restaurant Lease-End Reinstatement
“We expected the hacking works would take weeks, but the crew cleared the kitchen and both bathroom floors in just three days. Walked in after the hacking works, the space felt twice as big.”
Project Overview
Lease-end reinstatement of an F&B restaurant unit in Raffles City back to its base-build condition. Scope included kitchen demolition and equipment removal, extraction ductwork dismantling, feature ceiling strip-out, feature wall and floor tile hacking throughout the unit. All M&E modifications were capped back to management specification.
Size
Duration
Sector
Highlight Features
- A complete base-build reinstatement carried out within the mall’s restricted working window of 10pm to 8am. The scope included the removal of extraction ductwork and precise M&E capping to mall management’s specifications, ensuring that every technical requirement was addressed for a compliant, inspection-ready lease-end handover.
The Results
- Unit returned to base-build condition and accepted by mall management on first handover.
- Full kitchen, ductwork, ceiling, and flooring reinstatement completed in 8 working days.
- M&E capping executed to management specification, avoiding rework or lease deposit disputes.
Have a Project in Mind?
Tell us about your project, and we'll provide expert advice and a no-obligation quotation.
Your Trusted Reinstatement & Demolition Partner
We provide safe, compliant, and hassle-free reinstatement and demolition solutions for commercial, residential, and industrial projects.
Sat-Sun: Closed
Singapore 529435






