Projects

From commercial reinstatement and demolition to residential hacking works, our portfolio showcases projects safely and with confidence across Singapore.

BEFORE
previous arrow
next arrow
HDB Hacking Works

317 Ang Mo Kio

5-Room HDB – Full Tile Hacking & Wall Removal

A complete HDB hacking project to create an open-concept kitchen. The works included non-structural wall hacking, floor tile removal, dismantling of built-in carpentry, ceiling removal, and service disconnection, preparing the home for a more spacious, functional, and renovation-ready layout.

Size

1,200 sqft

Duration

3 Working Days

Sector

HDB Residential

BEFORE
previous arrow
next arrow
Condo Hacking Works

Lorong M Telok Kurau

Partial Demolition &
Dismantling Carpentry

Partial demolition of a condo unit. The scope included removing the existing flooring, demolishing selected internal walls, removing the false ceiling and carefully dismantling built-in carpentry. Once demolition was complete, all debris was cleared, and the unit was handed over as a clean, open space, ready for renovation.
Size

650 sqft

Duration

2 Working Days

Sector

Condo Residential

BEFORE
previous arrow
next arrow
HDB Hacking Works

Clementi Ave 4

4-Room HDB – Full Tile Hacking & Wall Removal

A complete interior hacking project for a 4-room HDB flat ahead of full renovation. The works included wall and floor tile removal, kitchen cabinet dismantling, plumbing point capping, and partition wall hacking, preparing the home for a complete renovation and a more open, functional living space.

Size

990 sqft

Duration

7 Working Days

Sector

HDB Residential

BEFORE
previous arrow
next arrow
HDB Hacking Works

Bishan Street 24

4-Room HDB – Full Tile Hacking & Wall Removal

A complete tile hacking project for a 4-room HDB resale flat before renovation. The works included floor tile removal throughout the living, dining, and bedrooms, together with wall and floor tile hacking in the bathrooms and kitchen, preparing the home for new finishes and renovation works.

Size

990 sqft

Duration

6 Working Days

Sector

HDB Residential

BEFORE
previous arrow
next arrow
Condo Hacking Works

Jalan Loyang Besar

Condo & Detached House – Bathroom Hacking & Tile Removal

Extensive demolition works for a 3.5-storey condominium detached house before renovation. The works included floor and wall tile hacking, dismantling bedroom headboards, feature walls, built-in carpentry, and false ceilings, preparing the property for the next phase of renovation works.

Size

4,600 sqft

Duration

10 Working Days

Sector

Condo Residential

BEFORE
previous arrow
next arrow
Condo Hacking Works

Holland Road

Condo – Bathrooms & Kitchen Demolition, Floor and Tile Removal

Full bathroom and kitchen demolition for a condominium unit before renovation. The works included hacking wall and floor tiles, removing sanitary fittings, dismantling kitchen cabinets, plumbing point capping, and waterproofing removal, preparing the unit for a complete renovation.

Size

1,200 sqft

Duration

8 Working Days

Sector

Condo Residential

BEFORE
previous arrow
next arrow
Condo Hacking Works

Whampoa Road

Condo – Bathrooms & Kitchen Demolition, Floor and Tile Removal

This condominium renovation began with a complete demolition of the kitchen and both bathrooms. Our scope included the removal of wall and floor tiles, sanitary fittings, built-in kitchen cabinets, wardrobes, countertops, and existing plumbing fixtures to prepare the space for renovation.

Size

1,200 sqft

Duration

8 Working Days

Sector

Condo Residential

BEFORE
previous arrow
next arrow
Landed Terrace House Demolition

Jalan Sankam

Whole-Unit Landed House Demolition

Comprehensive demolition works for a terrace house at Jalan Sankam before major renovation. The works included non-structural wall hacking, roof and rooftop shelter removal, kitchen demolition, wall and floor tile hacking, timber decking dismantling, and pond drainage, preparing the property for redevelopment and construction works.

Size

2,200 sqft

Duration

16 Working Days

Sector

Landed

BEFORE
previous arrow
next arrow
Condo Hacking Works

Lorong 3 Toa Payoh

Condo – Bathrooms & Kitchen Demolition, Floor and Tile Removal

This condominium in Toa Payoh required selective demolition works for a bathroom renovation while the rest of the home remained fully occupied. Prior to commencement, MCST approval was obtained, and lift protection was installed in accordance with building management requirements.

Size

1,200 sqft

Duration

5 Working Days

Sector

Condo Residential

BEFORE
previous arrow
next arrow
Condo Hacking Works

Ewe Boon Road

Condo – Full Tile Hacking &
Wall Removal

A full-house hacking project, carried out ahead of a complete renovation. Scope included hacking of the kitchen wall to make way for an open-concept kitchen, floor tile removal throughout the unit, and bathroom wall and floor tile hacking, a complete strip-out clearing the way for the incoming full renovation.

Size

XXXX sqft

Duration

XX Working Days

Sector

Condo Residential

BEFORE
previous arrow
next arrow
Fashion Retail

International Plaza

Fashion Retail – Lease-End Reinstatement

Lease-end reinstatement of a fashion clothing and apparel retail unit at International Plaza, engaged after the tenant's lease ended. Scope covered removal of the feature wall, track lighting, partitioned fitting room, cashier counter, and display racks, returning the unit to base-build condition ahead of handover to landlord management.

Size

XXXX sqft

Duration

XX Working Days

Sector

F&B/Retail

BEFORE
previous arrow
next arrow
F&B Reinstatement

Raffles City

Restaurant Unit –
Lease-End Reinstatement

Lease-end reinstatement of an F&B restaurant unit in Raffles City back to its base-build condition. Scope included kitchen demolition and equipment removal, extraction ductwork dismantling, feature ceiling strip-out, and floor tile hacking throughout the unit. All M&E modifications were capped back to management specification.

Size

1,970 sqft

Duration

2 Months

Sector

Commercial

BEFORE
previous arrow
next arrow
Commercial Reinstatement

River Valley

Student Hostel –
Full Reinstatement

This project involved the demolition and strip-out of an eight-storey commercial building to prepare the premises for handover to the incoming interior design firm. The project was carefully planned and executed in phases to ensure safe, efficient demolition with minimal disruption.

Size

23,000 sqft

Duration

2 Months

Sector

Commercial

BEFORE
previous arrow
next arrow
MCST Common Area

Prinsep Road

Commercial – Rooftop Common Area Demolition for A&A Works

Partial demolition of a rooftop common area in a commercial development at Prinsep Road to facilitate addition and alteration works. Scope included installation of a sound barrier to contain noise from the site, disposal of soil from existing planter boxes, and hacking of the planter box structures and floor tiles beneath them.

Size

9,400 sqft

Duration

1 Month

Sector

MCST/Commercial

BEFORE
previous arrow
next arrow
F&B Reinstatement

Compass One

Restaurant Unit –
Lease-End Reinstatement

Lease-end reinstatement of a restaurant unit in Compass One shopping mall, returned to base-build specification ahead of mall management handover. Works included full kitchen demolition, extraction hood and ductwork removal, feature wall and ceiling dismantling, and floor tile hacking across the entire unit.

Size

1,000 sqft

Duration

3 Working Days

Sector

F&B/Retail

BEFORE
previous arrow
next arrow
School Campus Common Area

SUSS

Campus Common Area – Demolition for A&A Works

Dismantling works at a Singapore University of Social Sciences (SUSS) campus outdoor common area to prepare the space for Addition & Alteration works. Scope covered removal of existing wooden decking across 8,800 sqft, preparing the base for incoming contractors to carry out waterproofing and lay new floor tiles.

Size

8,800 sqft

Duration

10 Working Days

Sector

MCST/Commercial

Contact Us

Ready To Start Your Project?

Whether you’re planning a lease-end reinstatement, demolition, or site preparation works, our team is here to help. Share your project requirements, and we’ll provide a quotation and project programme tailored to your timeline.

Request A Quote
See Our Work
Tagline_Project_Thumbnail-International Plaza

International Plaza

Full-house hacking works along Ewe Boon Road, preparing the...
Tagline_Project_Thumbnail-Ewe Boon Road

Ewe Boon Road

Full-house hacking works along Ewe Boon Road, preparing the...
Tagline_Project_Thumbnail-SUSS

SUSS

Full demolition and hacking works for a 4,600 sqft,...
Tagline_Project_Thumbnail-Compass One

Compass One

Full demolition and hacking works for a 4,600 sqft,...
Tagline_Project_Thumbnail-Prinsep Road

Prinsep Road

Full demolition and hacking works for a 4,600 sqft,...
Tagline_Project_Thumbnail-River Valley

River Valley

Full demolition and hacking works for a 4,600 sqft,...