Lorong 3 Toa Payoh
Careful bathroom strip-out with MCST approval, lift protection and contained works to minimise disruption to the occupied home.



Lorong 3 Toa Payoh • Condominium
Bathroom Renovation, Occupied Unit
“The crew kept everything contained, got MCST approval sorted, and protected the lift and kept the corridor area clean. Barely felt like construction was happening."
Project Overview
This condominium in Toa Payoh required selective demolition works for a bathroom renovation while the rest of the home remained fully occupied. Prior to commencement, MCST approval was obtained, and lift protection was installed in accordance with building management requirements.
Size
Duration
Sector
Highlight Features
- A selective, contained demolition executed around a fully occupied residential household, MCST approval secured and lift protection installed before works began, minimising disruption to both the residents and the wider building community.
The Results
- Bathroom demolition completed with minimal disruption to the rest of the occupied unit.
- MCST approval and lift protection secured ahead of mobilisation, avoiding delays.
- Common property (lift, corridors) left undamaged throughout the works.
Have a Project in Mind?
Tell us about your project, and we'll provide expert advice and a no-obligation quotation.
Your Trusted Reinstatement & Demolition Partner
We provide safe, compliant, and hassle-free reinstatement and demolition solutions for commercial, residential, and industrial projects.
Sat-Sun: Closed
Singapore 529435






